As seen on



The 2025 tax law ended §179D for buildings that begin construction after June 30, 2026 and ended §45L for homes acquired after June 30, 2026. Those dates have passed, but many projects can still be claimed, some for years. Here is what is still on the table.

Get a Free 179D / 45L Review

Tell us about your business and a specialist from our partner network will follow up.

"*" indicates required fields

Name*

Short answer: P.L. 119-21 terminated the §179D energy-efficient commercial buildings deduction for property “the construction of which begins after June 30, 2026,” and the §45L new energy efficient home credit for homes “acquired after June 30, 2026.” So §179D is still available for qualifying projects that began construction on or before June 30, 2026, whenever they are placed in service. §45L is still available for qualifying homes acquired (sold or leased to a resident) on or before June 30, 2026, on the return for that year or an amended return while the year is open.

What Is Still Claimable as of November 2026

Situation§179D§45L
Started (179D) or acquired (45L) on or before June 30, 2026, not yet claimedYes, in the year the property is placed in serviceYes, on the return for the year the home was acquired
Placed in service in a prior year and missedAmended return for open yearsAmended return for open years
Started (179D) or acquired (45L) after June 30, 2026NoNo
Designer of a government or nonprofit buildingYes, with a written allocation, for projects that began on timeNot applicable
Based on IRS FAQs on P.L. 119-21 and the Form 7205 and Form 8908 instructions.

Section 179D: How the Deadline Works

The test is when construction began, not when the building opens. A commercial building, a large multifamily building of four or more stories, or a retrofit that began construction by June 30, 2026 can still qualify when it is placed in service in 2026, 2027 or later. The deduction is claimed on Form 7205 for the tax year the property is placed in service.

The IRS FAQs confirm the termination date but do not explain how to determine when construction begins for §179D. Practitioners commonly look to the physical work test and the 5% safe harbor used for energy credits. Because the rules for this deduction are not settled, document the start date carefully: contracts, invoices, site photos and dated cost records.

For tax years beginning in 2026, Rev. Proc. 2025-32 sets the deduction at $0.59 to $1.19 per square foot, or $2.97 to $5.94 per square foot when prevailing wage and apprenticeship requirements are met, scaling with energy savings above 25%. The deduction is reduced by §179D deductions taken on the same building in the prior three years (four years for an allocated deduction).

Designer Allocations for Government and Nonprofit Buildings

Government entities and tax-exempt organizations cannot use a tax deduction, so §179D lets the owner allocate it to the designer: the architect, engineer, contractor or other party primarily responsible for designing the energy-efficient property and creating its technical specifications. A person who only installs, repairs or maintains the property is not a designer.

Because public projects such as schools and municipal buildings can take years from groundbreaking to completion, design firms may keep claiming §179D on projects that started before the cutoff well into the future. Getting the allocation letter signed during the project, not years later, avoids problems.

Section 45L: Homes Acquired by June 30, 2026

An eligible contractor (the builder or the party that substantially reconstructs the home) claims §45L on Form 8908 for homes acquired from it during the tax year for use as a residence. A lease to a tenant counts as an acquisition. A home the builder keeps for its own use does not.

Home type (acquired 2023 through June 30, 2026)Credit per home
Single-family or manufactured, ENERGY STAR$2,500
Single-family or manufactured, Zero Energy Ready Home$5,000
Multifamily unit, ENERGY STAR, prevailing wage met$2,500
Multifamily unit, Zero Energy Ready, prevailing wage met$5,000
Multifamily unit, ENERGY STAR, no prevailing wage$500
Multifamily unit, Zero Energy Ready, no prevailing wage$1,000
Source: IRS Instructions for Form 8908. Multifamily increased amounts require Form 7220.

Certification timing matters. The Form 8908 instructions say the contractor must obtain any required certification before the home is acquired. A home sold before it was certified cannot be fixed after the fact.

For builders, the practical work now is reviewing every home or unit closed or leased from 2023 through June 30, 2026, confirming certifications, and claiming any that were missed. Missed credits for earlier years are generally claimed on an amended return within the refund statute of limitations, which is usually three years from when the return was filed. Unused credits are part of the general business credit and can generally be carried back one year and forward 20 years.

How This Fits With Cost Segregation

Energy-efficient buildings that began construction before the cutoff are often also good candidates for a cost segregation study, especially new multifamily and commercial projects. Lighting, HVAC and envelope costs studied for §179D overlap with the component analysis a study already performs, and the cost basis is reduced by the §179D deduction. Our partner network can review §179D, §45L and depreciation together. Start with the cost segregation calculator, or see cost segregation for multifamily and what the One Big Beautiful Bill changed for cost segregation.

Frequently Asked Questions

Can I still claim 179D after June 30, 2026?

Yes, for property whose construction began on or before June 30, 2026. The deduction is claimed in the year the property is placed in service, which can be 2026 or later. Projects that began construction after June 30, 2026 do not qualify.

What does “acquired” mean for 45L?

The home must be acquired from the eligible contractor by a person for use as a residence. A sale or a lease to a resident counts. The deadline is June 30, 2026.

Can I amend prior returns to claim 45L or 179D?

Generally yes, for tax years still open under the refund statute of limitations, usually three years from the date the original return was filed. For 45L, the home must have been certified before it was acquired.

Can architects claim 179D on government buildings?

Yes. The building owner can allocate the deduction in writing to the designer primarily responsible for the energy-efficient design, following Notice 2008-40. This also applies to buildings owned by other tax-exempt organizations.

How is the start of construction determined for 179D?

IRS has not published §179D-specific guidance on this in its OBBB FAQs. Many practitioners apply the physical work test or the 5% safe harbor from energy credit guidance. Keep strong documentation of the start date.

Finished an energy-efficient project since 2023? We can check what is still claimable under §179D, §45L and cost segregation. Call 360-641-7709 or use the button below.

Last updated November 2, 2026. This page is general information, not tax or legal advice. Confirm your situation with a qualified tax professional.

Sources