Aerospace and defense companies do some of the most technically uncertain work in the economy, from airframes and propulsion to flight software and new materials. Whether that work earns the research credit often depends less on the engineering and more on the contract. This page explains both.
Get a Free R&D Credit Review
Tell us about your business and a specialist from our partner network will follow up.
"*" indicates required fields
Short answer: aerospace companies can claim the R&D tax credit for design, analysis, prototyping and testing that resolves technical uncertainty, including work performed under government contracts, as long as the research is not “funded.” Under Section 41(d)(4)(H) and Treas. Reg. §1.41-4A(d), research is funded if your payment does not depend on the success of the research, or if you keep no substantial rights to the results. Fixed-price contracts where you absorb the cost of failed work often support a claim. Cost-reimbursement contracts usually do not.
The credit is the federal R&D tax credit, and domestic research spending is also deductible in the current year under Section 174A. Suppliers that design parts to customer specifications should also read our page on engineering firms, which covers the same funded-research rules.
Aerospace Work That Often Qualifies
| Often qualifies | Usually does not qualify |
|---|---|
| Designing structures, propulsion or thermal systems to meet new weight, load or temperature targets | Building to a fully settled, previously proven design |
| Developing or qualifying new materials, composites, coatings or joining methods | Routine first-article inspection and quality control testing |
| Modeling and simulation (FEA, CFD) to compare design alternatives | Certification paperwork and drafting after the design is fixed |
| Flight software, avionics and embedded control development | Reverse engineering an existing part to duplicate it |
| Developing new manufacturing processes, tooling methods or inspection techniques | Adapting an existing product to a customer’s needs without technical uncertainty |
| Building and testing prototypes and pilot models | Research after the item begins commercial production, except new improvements |
Every activity still has to pass the four-part test. Treasury regulations also apply a “shrinking-back” rule: if a whole aircraft system does not qualify, you test the next most significant subset of it, such as a single assembly or process.
Government Contracts and the Funded Research Exclusion
Funded research is excluded no matter how innovative it is. The regulations ask two questions about each contract, and courts have applied them to aerospace and defense contracts for decades:
- Who bears the cost if the research fails? In Fairchild Industries v. United States (Fed. Cir. 1995), an Air Force contract required work that met specifications, and inspection and acceptance terms meant Fairchild would not keep payment for failed work. The court held Fairchild bore the financial risk, so the research was not funded. Progress payments did not change that because they had to be returned if the work failed.
- Do you keep substantial rights? In Lockheed Martin Corp. v. United States (Fed. Cir. 2000), the government held broad rights to the research, but Lockheed could still use the results in its business without paying for them. The court held that the right to use research results, even without exclusive rights, is a substantial right.
Later cases cut the other way on different facts. Capped or cost-plus-to-a-maximum contracts without acceptance terms tied to success were treated as funded in Geosyntec (11th Cir. 2015). In Dynetics (Fed. Cl. 2015), contract restrictions on using the results and broad intellectual property clauses defeated the substantial-rights test.
| Contract type | Who usually bears financial risk | Typical outcome |
|---|---|---|
| Firm-fixed-price with inspection and acceptance | The contractor | Often not funded, if the contractor keeps substantial rights |
| Cost-reimbursement / cost-plus | The government or customer | Usually funded and excluded |
| Time-and-materials | The customer | Usually funded and excluded |
| Capped or not-to-exceed without success criteria | Often the customer | Often funded; read the payment terms |
| Company-funded internal research | The company | Not funded |
| Grants (for example, SBIR awards) | Depends on the award terms | Research paid for by a grant is generally funded to that extent |
Primes, Subcontractors and Who Claims
The same tests apply at every tier. A subcontractor’s rights and risk come from its subcontract with the prime, not from the prime contract, though flow-down clauses on data rights and payment can carry the government’s terms down the chain. A prime on a cost-reimbursement contract that hires a sub on a fixed-price basis may have funded research itself while the sub bears the risk on its piece. Each party has to read its own agreement, and only one party can claim any given research.
Many states also offer their own research credits, with rules that differ from the federal credit. See our guide to state R&D tax credits.
Typical QREs for Aerospace Companies
- Wages of engineers, scientists, test technicians and the first-line managers who directly supervise or support the research.
- Supplies consumed in research: prototype materials, test articles destroyed in testing, and fuel or consumables used in test runs. Equipment, tooling and test rigs you keep are depreciable property and do not count.
- Contract research: 65% of amounts paid to U.S. third parties performing qualified research for you, such as test labs, when you bear the cost and keep rights.
- Cloud computing paid for the right to use computers in qualified research, such as rented capacity for simulation.
Hypothetical example. Say a mid-size aerospace supplier has $3 million of QREs this year after removing cost-plus programs as funded. Its QREs averaged $2.5 million over the prior three years. Under the ASC, the credit is 14% × ($3 million − $1.25 million) = $245,000, before any Section 280C election.
Section 174A, Section G and Records
| Spending | Tax treatment after OBBBA (P.L. 119-21) |
|---|---|
| Domestic R&E (tax years beginning after 2024) | Deducted in full under Section 174A, or elect to amortize over at least 60 months |
| Foreign R&E | Still amortized over 15 years under Section 174; never a QRE for the credit |
For tax years beginning after 2025, companies with more than $1.5 million of QREs or more than $50 million of average gross receipts must complete Form 6765 Section G, which reports each business component. For aerospace companies, that means matching each program or part number to its contract, its wages and its experimentation. Useful records include:
- The contract, modifications and the payment, acceptance, warranty and data-rights clauses.
- Evidence of who absorbed overruns or rework on failed designs.
- Design reviews, test plans, test reports and failure analyses.
- Time records by program and phase, so research can be separated from production and sustainment work.
Related guides: automotive, software development and AI and machine learning. Estimate your credit with the R&D tax credit calculator.
Frequently Asked Questions
Do aerospace companies qualify for the R&D tax credit?
Yes, for design, analysis, prototyping and testing that resolves technical uncertainty through a process of experimentation, when the research is not funded by a customer or the government.
Can defense contractors claim the R&D credit on government contracts?
Yes, if the contractor bears the financial risk of failure and keeps substantial rights to use the results. Fixed-price contracts often meet this; cost-reimbursement contracts usually do not.
What did the Fairchild case decide?
The Federal Circuit held that a contractor whose payment depended on meeting specifications bore the financial risk, so its research under an Air Force contract was not funded.
Does the government’s license to my research mean I lack substantial rights?
Not necessarily. In Lockheed Martin, the court held that keeping the right to use the research results, even without exclusive rights, is a substantial right.
Do tooling and test equipment count as QREs?
No. Depreciable property is excluded from supplies. Materials consumed or destroyed in testing can count.
See what your business qualifies for. One free review covers cost segregation, R&D, hiring credits and benefits savings together. Call 360-641-7709 or use the button below.
Last updated November 3, 2026. This page is general information, not tax or legal advice. Confirm your situation with a qualified tax professional.
Sources
- Treas. Reg. §1.41-4A, including the funded research rules (Cornell LII)
- The Tax Adviser: The research credit and funded research (Mar. 2023; Fairchild, Lockheed Martin, Geosyntec, Dynetics)
- 26 U.S.C. §41, credit for increasing research activities (Cornell LII)