Renewable energy companies solve new technical problems constantly, from battery chemistry and inverter controls to tracker software and site-specific foundation designs. The research credit can reward that work, but the industry also has traps: costs that end up inside a depreciable power plant, and contracts that make the research “funded.”
Get a Free R&D Credit Review
Tell us about your business and a specialist from our partner network will follow up.
"*" indicates required fields
Short answer: renewable energy companies can claim the R&D tax credit for developing new or improved energy technologies, components, software and processes when the outcome was technically uncertain and engineers tested alternatives. Common examples are battery and cell development, power electronics and controls, monitoring and forecasting software, and new installation or manufacturing methods. Building a standard solar or wind project with proven equipment does not qualify, and anything that becomes part of depreciable plant is not a supply cost. The research credit is separate from the energy credits (Sections 45, 48, 45Y and 48E) and is claimed on Form 6765.
For the full rules see the federal R&D tax credit. Companies that design projects for clients should read the funded-research rules on our engineering firms page.
Four-Part Test: Renewable Energy Examples
The four-part test applied to a battery storage project
- Permitted purposeDevelop a storage system with better cycle life or a safer thermal design.
- Technological in natureRelies on electrochemistry, electrical and mechanical engineering.
- UncertaintyUnknown whether a new cell chemistry or cooling layout would meet life and safety targets.
- ExperimentationModel, build test modules, run cycling and abuse tests, refine the design.
All four must be met for each business component. If the whole system fails, test a smaller part, such as the thermal management design.
What Qualifies and What Usually Does Not
| Often qualifies | Usually does not qualify |
|---|---|
| Developing new cell chemistries, module designs or battery management systems | Installing proven modules and inverters per manufacturer specs |
| Inverter, power-electronics and grid-control algorithm development | Interconnection studies and permitting paperwork |
| Forecasting, monitoring and dispatch software you sell or license | Routine O&M monitoring with off-the-shelf SCADA |
| New foundation, racking or tracker designs where loads and soils created real uncertainty | Standard engineering using known methods for a typical site |
| New manufacturing methods for panels, blades, electrolyzers or components | Production after commercial release, other than new improvements |
| Pilot plants and test rigs used to prove a process | Resource assessments and market or feasibility studies |
Related: R&D tax credit for mining companies
The Typical QRE Mix
Hardware developers spend more on materials and test articles. Project developers and software firms are mostly wages. A hardware startup might look like this:
| Cost | Counts? | Notes |
|---|---|---|
| Engineer, chemist and technician wages | Yes, for research time | Includes direct supervision of the research |
| Test cells, modules and materials used up in testing | Yes, as supplies | Items that become part of a depreciable asset do not count |
| Outside test labs and U.S. engineering contractors | 65% of the payment | You must keep rights and bear the cost of failure |
| Cloud compute for simulation and model training | Yes | Running a live fleet does not count |
| Test equipment, pilot-plant equipment, installed systems | No | Depreciable; may be recovered through depreciation or an energy credit |
Project developers and EPC firms look different again. Their claims are almost all engineering wages on first-of-a-kind designs, with few supplies, because the hardware ends up in a depreciable plant.
Rules That Trip Up Energy Companies
Depreciable property is never a supply. Section 41(b)(2)(C) excludes property of a character subject to depreciation. A prototype array that is later energized and used to sell power is a depreciable asset, not a research supply. Treas. Reg. §1.174-2 treats the costs of a pilot model as research costs, but the credit’s supply definition still turns on whether the item is depreciable. The Tax Court’s TG Missouri decision (133 T.C. 278, 2009) shows the line: molds the taxpayer did not own or depreciate could be supplies.
Funded research. Engineering and EPC firms that design under client contracts must show that payment depended on success and that they kept substantial rights to use the results, under Treas. Reg. §1.41-4A(d). Time-and-materials contracts usually make the work funded.
Energy credits and the research credit are separate. Placing a qualifying facility in service can earn an energy credit on its depreciable basis, while the research credit covers wages, supplies and contract research. Do not count the same dollars twice.
Related: R&D tax credit for oil and gas companies
Documentation Tips
- Write down performance, cost or safety targets for each prototype before testing starts.
- Keep test protocols, cycling data and failure analyses with dates.
- Track which hardware was consumed or scrapped and which went into service.
- Keep contracts showing who owns the IP and who pays for failed designs.
- Record engineer time by project, separating field support and O&M.
Hypothetical Example: A Young Storage Company
Say a storage developer has $900,000 of QREs this year, and $0, $400,000 and $700,000 in the three prior years. Because one prior year had no QREs, the ASC is 6% of current QREs, or $54,000. With the reduced-credit election under Section 280C(c)(2) at the 21% corporate rate, it is $42,660. If the company has less than $5 million of gross receipts and first had receipts within the last five years, it may elect to apply the credit against payroll taxes through the payroll tax offset, up to $500,000 a year.
Estimate Your Credit
Estimate your own federal credit. Enter your research wages, supplies and contractor costs:
The calculator gives a rough figure. A specialist will test each project against the four-part test before anything is filed. The ASC is used in the examples here; the Regular credit can be larger for companies with long, steady research histories.
2026 tax treatment. Under Section 174A, added by the One Big Beautiful Bill Act (P.L. 119-21), domestic research and experimental costs in tax years beginning after 2024 can be deducted in full in the year paid, or you can elect to amortize them over at least 60 months. Foreign research is still amortized over 15 years under Section 174 and never counts toward the credit. Because Section 280C(c) was restored, you either reduce your Section 174A deduction by the credit or elect the reduced credit under Section 280C(c)(2).
Related: chemical companies, manufacturing R&D, startups and all R&D credit industries.
Frequently Asked Questions
Can solar companies claim the R&D tax credit?
Solar companies that develop new products, controls, software or installation methods can. Installers building standard systems with proven equipment usually cannot.
Can I claim the R&D credit and an energy investment credit together?
Yes, as long as you do not count the same costs twice. Energy credits apply to depreciable property placed in service; the research credit covers wages, supplies and contract research.
Do prototype batteries count as supplies?
Test cells and modules used up or scrapped in testing generally count. Hardware that becomes part of a depreciable system does not.
Does battery software qualify?
Battery management, forecasting and dispatch software that you sell or that customers interact with follows the normal four-part test. Software used only for your own back-office functions faces a stricter internal-use test.
Is engineering for a client’s wind or solar project qualified research?
It can be if the design work involved real uncertainty and the contract is not “funded,” meaning your payment depended on success and you kept substantial rights to the results.
See what your business qualifies for. One free review covers cost segregation, R&D, hiring credits and benefits savings together. Call 360-641-7709 or use the button below.
Last updated November 5, 2026. This page is general information, not tax or legal advice. Confirm your situation with a qualified tax professional.
Sources
- 26 U.S.C. §41, credit for increasing research activities (Cornell LII)
- Treas. Reg. §1.41-2, qualified research expenses, supplies and contract research (Cornell LII)
- Treas. Reg. §1.41-4A, including the funded research rules (Cornell LII)
- The Tax Adviser: Definition of supplies clarified for the research credit (TG Missouri Corp., 133 T.C. 278)
- 26 U.S.C. §174A, domestic research or experimental expenditures (Cornell LII)